Document Type : Original Research Paper

Authors

1 Department of Electrical Engineering, Shahid Bahonar University of Kerman, Kerman, Iran.

2 Department of Electrical Engineering, Islamic Azad University, Marvdasht Branch, Marvdasht, Iran.

Abstract

Background and Objectives: The smart energy hub framework encompasses physical assets such as thermal storage, boiler, wind turbine, PV panel, water storage and, water desalination unit to ensure continuity of electricity, water, thermal, and gas provision in the case of unexpected outages in the upstream networks. In this regard, the smart energy hub as an integrated structure provides a suitable platform for energy supply. Considering the drinking water resources in the smart hub structure can cause operational efficiency improvement.
Methods: This paper proposes an integrated scheduling model for energy and water supply. To address the issue of increasing operational flexibility, a set of new technologies such as Compressed Air Energy Storage (CAES) and Power-to-Gas (P2G) system are provided. Also, the energy price is modeled as an uncertain parameter using a robust optimization approach. The proposed model is established as a Mixed Integer Linear Function (MILP). The mentioned model is implemented using the CPLEX solver in GAMS software. The proposed model is simulated in different scenarios in the energy hub and the optimization results are compared with each other to validate the proposed method.
Results: The results show that using CAES technology and the P2G system can lead to reducing the operating costs to a desirable level. Moreover, the impact of the P2G unit on the operation cost is more than the CAES unit.
Conclusion: The energy hub operator should tradeoff between robustness and operation cost of the system. The obtained results ensured that the proposed methodology was robust, optimal, and economical for energy hub schedules.

Keywords

Main Subjects

Open Access

This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made. The images or other third party material in this article are included in the article’s Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the article’s Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this license, visit: http://creativecommons.org/licenses/by/4.0/

 

Publisher’s Note

JECEI Publisher remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

 

Publisher

Shahid Rajaee Teacher Training University


LETTERS TO EDITOR

Journal of Electrical and Computer Engineering Innovations (JECEI) welcomes letters to the editor for the post-publication discussions and corrections which allows debate post publication on its site, through the Letters to Editor. Letters pertaining to manuscript published in JECEI should be sent to the editorial office of JECEI within three months of either online publication or before printed publication, except for critiques of original research. Following points are to be considering before sending the letters (comments) to the editor.


[1] Letters that include statements of statistics, facts, research, or theories should include appropriate references, although more than three are discouraged.

[2] Letters that are personal attacks on an author rather than thoughtful criticism of the author’s ideas will not be considered for publication.

[3] Letters can be no more than 300 words in length.

[4] Letter writers should include a statement at the beginning of the letter stating that it is being submitted either for publication or not.

[5] Anonymous letters will not be considered.

[6] Letter writers must include their city and state of residence or work.

[7] Letters will be edited for clarity and length.

CAPTCHA Image